Owners
Track utility capacity across every expansion package and catch over-commitment before it becomes a change order.
FacilityConnect unifies your equipment, install timelines, utility capacity, and distribution design into one living model — for any service, from electrical power to process gas. Built for semiconductor, pharma, and data center teams.
Used in programmes where utility coordination, schedule pressure, and design accuracy all have to hold together. One generic demand-and-supply model covers every discipline — electrical, mechanical, process fluids, gases, and any service your project defines.
Owners, general contractors, and tool install teams all work from the same living source of technical truth.
Track utility capacity across every expansion package and catch over-commitment before it becomes a change order.
Coordinate multi-phase utility scope through shared scenarios — raise, review, and apply connection changes with a full audit trail, and import equipment lists straight from spreadsheets.
Validate every tool's demand against live Points of Connection, panel headroom, and install timelines before committing the design.
The workflow turns fragmented utility coordination into a model teams can trust, query, and act on. And when the load-to-supply puzzle gets big, the Optimizer — available today as a service, in-product in the coming months — proposes the best design straight into a scenario. The Optimizer proposes; your team decides.
Import equipment lists from spreadsheets with live progress, and lay out buildings, levels, and grid lines — every asset placed, every connection point defined.
Wire demand to supply across electrical, process gas, CHW, exhaust, and any service you define — with correction factors, capacity limits, and a full history of who changed what.
Branch alternatives from your baseline, model when every tool installs or moves out, and watch capacity vs. load over the life of the build — across all services at once.
The platform is designed for high-cost coordination environments where late decisions carry real programme and capex risk.
Electrical panel facilitation in a US 300mm fab.
Bulk gas lateral facilitation in a US 300mm fab.
EMEA 300mm fab tool install design and hookup.
Tier 1 Semicon POC assignment across US, EMEA, and APAC.
From semiconductor fabs to pharma sites and data centers, the model stays precise even as scale and coordination complexity increase.
Schedule a personalized walkthrough and see how FacilityConnect supports planning, delivery, and live coordination.